- Overview
- Product Parameters
- Product Description
- Detailed Photos
- Certifications
- Our Advantages
- Packaging & Shipping
- Company Profile
- FAQ
Basic Info.
Model NO.
WZSS
Type
Sludge Dewatering Machine
Method
Physical Treatment
Usage
Industrial, Home, Agriculture, Hospital
Power
1.12-8.2kw
Certificate
SGS, ISO
Raw Material
Carbon Steel
Principle
Physical Filtration
Service Life
10 Years
Colour
Customizable
Transport Package
Sea Freight
Specification
customizable
Trademark
Wanze Prosperity
Origin
Weifang, Shandong, China
HS Code
8421219090
Production Capacity
2000 Pieces/Year
Packaging & Delivery
Package Size
230.00cm * 100.00cm * 130.00cm
Package Gross Weight
500.000kg
Product Description
Stacking screw machine | Standard Material | Absolute dry sludge treatment capacity(kg-Ds/h) | Overall dimensionsL*W*H(mm) | Equipment weight(kg) | power(kw) | |||
(L)long | (W)wide | (H)high | Net weight | working | ||||
WZ101 | S.S.304 (optional with other materials) | 4~10kg-/h | 2200 | 800 | 1300 | 178 | 245 | 1.12 |
WZ201 | 9~20kg-/h | 2900 | 800 | 1500 | 250 | 390 | 1.3 | |
WZ202 | 18~40kg-/h | 3000 | 1100 | 1500 | 450 | 650 | 2.05 | |
WZ301 | 30~60kg-/h | 3300 | 900 | 1720 | 700 | 1230 | 1.65 | |
WZ302 | 60~120kg-/h | 3500 | 1200 | 1720 | 1300 | 2050 | 2.2 | |
WZ303 | 90~180kg-/h | 3500 | 1600 | 1700 | 1750 | 3100 | 4.4 | |
WZ401 | 80~200kg-/h | 4300 | 1100 | 1900 | 1350 | 3500 | 2.2 | |
WZ402 | 160~380kg-/h | 4300 | 1400 | 1900 | 2350 | 3650 | 3.3 | |
WZ403 | 240~550kg-/h | 4300 | 2000 | 1950 | 3050 | 4550 | 4.4 | |
WZ501 | 200~300kg-/h | 5000 | 1200 | 1900 | 1510 | 3000 | 2.6 | |
WZ502 | 400~600kg-/h | 5100 | 1600 | 1900 | 2800 | 4500 | 4.1 | |
WZ503 | 600~900kg-/h | 5100 | 2300 | 1900 | 4100 | 5500 | 5.6 |
The stacked screw type sludge dewatering machine of the stacked screw machine is a filtering device formed by stacking fixed rings and movable rings, and the spiral shaft runs through them. When the equipment is running, the sludge enters the filter cartridge from the feeding port and is pushed towards the discharge port by the spiral shaft blades.
As the pitch between the spiral shaft blades gradually decreases, the pressure on the sludge also increases. Under the pressure difference, the sludge begins to dehydrate, and water flows out from the filtering gap between the fixed ring and the movable ring.









1.Q: Where is your company? How can I visit there?
A:The company is located in Zhongcheng International, Kuiwen District, Weifang City, Shandong Province, China. It is about an hour's drive from Qingdao Airport and Weifang Railway Station. If you need it, we can come and pick you up. Welcome to visit our company. 2.Q:Do you have minimum order quantity request?
A:No minimum order, but it can get a discount if you order a large quantity.
A:No minimum order, but it can get a discount if you order a large quantity.
3.Q:Do you have certificates?
A:Yes,we have ISO,SGS certificate.
4.Q:Can you meet my special requirements for the product?
A:Yes,we have a professional design team.We can provide drawings according to your requirements.
5.Q:How to buy your idea products?
A:You can provide us your water or waste sources,water or waste quality,flow rate and ground area (connect us for more details) .
6.Q:How to pay?
A:T/T and L/C are acceptable and T/T will be more appreciated 30% deposit before producing,70% balance before loading by T/T.
7.Q:What is the delivery time ?
A: It depends on order quantities .Generally speaking ,the delivery time will be within 2 to 4 weeks.
8.Q:How to pack the products?
A:We use standard package .If you have special package requirements ,we will pack as required ,but the fees will be paid by customers.
9.Q:How do you manufacture your equipment?
A:Our machining technology includes laser 1 plasma cutting ,automatic welding, CNC cutting and bending.